What does pre-construction termite treatment cover?
It covers the soil and the wood that will support the house, applied before the foundation is closed in. The rules name pre-construction soil termiticide application and pre-construction wood treatment as the measures for this stage.
The soil work is done at the site while the ground is open, and the wood work is done before it is installed. Each measure is recorded so that the later annual inspections can compare the house against the original work.
The method and the areas treated are set out in writing. A homeowner or builder who keeps the contract and the diagram has a complete record of what was done before the house was finished.
Why does the timing matter so much?
The soil and the framing are open during construction, and the work is easier to apply and to check at that stage than after the house is finished. Scheduling it around the construction avoids a gap in the record.
Treating a finished house is a different job, because the soil is covered and the wood is hidden by the structure. Pre-construction work happens while the site is open, so the technician can reach the soil and the wood directly, and the result can be recorded on the diagram.
Does a new house need a written contract?
Yes. Georgia's rules require a written contract for each job. A warranty-only contract also requires an initial inspection with a diagram, an annual inspection and a conspicuous statement of the limits.
The contract protects both the homeowner and the builder by setting out what was done and what will be checked later. The statement about inspection, future treatment and repair limits should be read before signing, since it describes what the warranty does and does not cover.
What moves the price up or down here?
The size of the site, the foundation type, the wood measures needed, the access during construction and whether the work is a single treatment or part of a contract shape the price. No figure is printed on this page, and the price is explained and approved in writing before any work starts.
A larger footprint means more soil to treat and more wood to cover. A crawl-space house adds the piers and the dirt floor to the work, and a slab house adds the perimeter and the penetrations. Access during construction can make the work faster or slower, depending on what the builder can open up.
What should a homeowner check after the house is finished?
The homeowner should keep the contract and the diagram, check that the annual inspection is booked, and watch for swarms, discarded wings and new damage. The record is what makes the annual inspection useful.
The first annual inspection compares the finished house against the original diagram. Any change in the soil, the joints or the penetrations is noted, and the homeowner can see whether anything has moved since the pre-construction work was done.